Friday, January 25, 2008
Inspection Results
Ok so you are all waiting and wondering how the inspection went today. Well, how do I say it. After months of hard work and four full days of Bill working pretty much non stop from morning until close to midnight.......we passed. Yippee! We are so excited. Bil is picking the uhaul up as we speak and we plan to move the beds in tonight. We are going to sleep in our new house tonight. I am so excited. Tomorrow we have a full day of moving planned with last minute moves on Sunday as well. We have some helpers lined up and hope it all goes smoothly.
Thursday, January 24, 2008
Tub tile work
Daryl was out today to do the tile work on the whirlpool tub, he got most of it finished and plans to return tomorrow to finish it up. We are hoping he gets it all done tomorrow as we have inspection tomorrow and this has to be done to get our occupancy permit. It looks awesome, I really like the design we chose, it blends so nicely in the bathroom.
Bill also got the front deck rails finished, and the step on the back deck, as well as all of the outlets in the basement finished. Tomorrow he needs to finish dryer vent, install pendant lights and dining room light and drywall the attic access (a code requirement we were unaware of).
Bill also got the front deck rails finished, and the step on the back deck, as well as all of the outlets in the basement finished. Tomorrow he needs to finish dryer vent, install pendant lights and dining room light and drywall the attic access (a code requirement we were unaware of).
Wednesday, January 23, 2008
Whirlpool tile work
The tile guy was out to measure the tile yesterday and is planning to return today to tile around the whirlpool tub in our master bathroom. I am very excited to see this completed. After he is finished with this, we just need him to tile the backsplash in the kitchen and fix a broken tile.
Tuesday, January 22, 2008
Granite installed
Our countertops were installed today, they look great. I am so glad we decided to go with granite over corian. We have a preliminary inspection tomorrow, if all goes well we plan to start moving in Friday night. It has been a long road but we are finally almost finished with it all.
Monday, January 21, 2008
Plumbing & Cleaning Almost Finished
This weekend was very productive, Bill was able to get the plumbing all finished up. My dad helped on Sunday, they got the master bathroom whirlpool tub hooked up. The only plumbing remaining at this point is the kitchen sink, and he has to wait for the granite to be installed to finish that up. Bill's mom came over to help me clean, we got Hannah and Elijah's rooms swept and mopped, the living room, dining room, master bedroom all swept, mopped, and windows cleaned. I was so greatful for her help. I finished cleaning the kitchen today, we are ready for the countertop now.
Sunday, January 6, 2008
Our bedroom and closet flooring installed






We worked beginning Friday night and finished up Sunday morning with our bedroom floor. It looks great, and we are both so glad it is done. I can't wait to see our bedroom furniture in the room with the ceiling fan, I think I got a perfect match. I threw in some pics of the master bathroom for fun, we still have the mirrows to install, vanity lights, shower door and toilet, as well as the tile around the tub, but it is coming along nicely as well.