.jpg)
Patio below living room deck
Garage concrete is completed.
A view from the back of the house of the garage.
The garage and patio concrete are poured and our brother in law has been cutting down the trees that need to go down for PP&L to run the power. We are working on finishing the plumbing and starting the electrical. Most of our time has been occupied by getting our current house finished and on the market. The kitchen is coming along nicely, the ceiling was textured last night, and the refrigerator has been removed from the kitchen so that the new flooring can be laid this weekend. Hopefully by the end of this weekend the kitchen will be pretty much finished.
2 comments:
Movin' right along. Wish I could see the new old kitchen (the one in Ickesburg). Put up a pic when it's done.
I will post a picture once it is completed, we got the sub floor laid over the weekend, and the new viynl. We cut part of the cabinet beside the sink to put a dishwasher in, we added a pantry cabinet around the chimney, and a cabinet above the refrigerator, we also added a cabinet between the stove and sink, this cabinet is perfect for baking sheets etc. We have the backsplash up and the new countertop on, we just have to install the dishwasher, trim around the windows, above the cabinets, and chairrail and baseboard and paint and the kitchen will be completed. I will post pictures once it is completed.
Post a Comment