Saturday, October 20, 2007
Basement Framed
Larry came up and helped Bill finish framing the basement walls, they also framed the wall beside the steps and door way to the future bedroom in the basement. We have scheduled the insulator to be out on Monday, they will insulate the garage and basement for us. The drywaller will also be out Monday evening to begin Day 3 (Evening 3) of the drywall. Sunday we plan to finish framing around the steps in the basement and start siding.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment